Plan Check Says “Add Sprinklers”? There’s a Smarter Way to Comply.
The "Plan Check" Reality
Receiving a correction letter requiring fire sprinklers is a common bottleneck in California ADU projects. Whether it’s due to the primary home being sprinklered, the ADU’s size, or its distance from the street, a "sprinkler mandate" often brings:
- Utility Fees: $2,000–$12,000 for water meter upgrades.
- Infrastructure Stress: Requirement for a 1" water main or a 300+ gallon storage tank.
- Project Delays: 4–8 weeks of additional administrative "red tape."
How Automist Clears Your Corrections
Automist provides a UL-listed path to compliance that works within your existing ADU design.
- Seamless Integration: Operates on a standard 3/4" domestic cold water line at just 2.4 GPM.
- No Infrastructure Upgrades: Avoid the "upsizing" of your water meter or the installation of expensive backflow preventers.
- Minimal Footprint: The compact pump fits under a sink or in a cabinet; wall-mounted heads require no ceiling pipework.
- California Code Ready: Meets California R313 requirements and provides life-safety performance equivalent to NFPA 13D.